• info@airavatindustries.com
  • +91 8830566896
  • 1.Operation & Maintenance of treatment facilities for STP, ETP and WTP by Deputing manpower with relevant experience
  • 2.Visit of the Technician/ Expert to ascertain the regular operation and maintenance of the STP, ETP and WTP once in a month.
  • 3.Operators shall carry dosing of required chemicals as per the optimum requirement for our guidelines & instructions.
  • 4.Preparation & follow the preventive maintenance schedules of Equipment & electrical panel.
  • 5.Preparation of Safety checks of the plant & adherence / fulfilment to the compliance if any
  • 6.Information about Electricity, utility & any specially chemicals & consumables required to run the plant will be supplied by party.
  • 7.Safe custody & security of plant equipments & chemicals at the site assigned by the party.
  • 8.Maintaining well protected workplace safe.